Dear Editor,

On Tuesday Feb. 4, the City of Maryville will ask voters to authorize revenue bonds to construct a new water treatment plant at Mozingo Lake. If you’ve lived in Maryville for any length of time, you may know that prior to 1994, the source of our drinking water was the 102 River just east of town. Our water treatment plant — constructed in 1958, upgraded in the mid-1990s, and still in use today — was originally built to treat water from the river. When extended drought events seriously threatened the amount of water available from the 102, our community constructed a new source for raw drinking water, Mozingo Lake. And though upgrades allowed the plant to be retrofitted to treat lake water, it was never the perfect solution.

Our city staff and water treatment professionals have done incredible work to keep our aging water plant functioning to meet the needs of our community (and all those that purchase water from Maryville, including Nodaway Public Water Supply District No. 1). That task, however, is becoming more difficult by the day. As Mozingo continues to age and the chemistry of the lake changes, taste and odor issues have become more common, and operating the plant at peak efficiency is more aspirational than the norm. The technology in the plant simply isn’t what’s best for our lake.

The Maryville City Council has been laser-focused since 2019 on developing a solution to not only permanently solve water quality concerns, but also make dramatic improvements in redundancy, efficiency, safety, and technology. Through that study and analysis, we know the best solution is to build a new, state-of-the-art water treatment plant along the shores of Mozingo Lake. This project will likely be the single largest infrastructure improvement project in the history of our community, and one that will secure plentiful, clean drinking water for literally generations to come.

The referendum on Feb. 4 asks Maryville voters to approve financing for up to $50 million for a new water treatment plant and associated transmission lines and other infrastructure. This is not a new tax; rather, the revenue bonds will be repaid through your water rates. Our engineer estimates show the average residential water user could see an increase in water rates, worst-case, of $10/month (and hopefully less). And while no one wants to pay more for a resource that literally falls from the sky, even with the worst-case scenario rate increase, our water will still be cheaper than our neighbors in Smithville, Excelsior Springs, and St. Joseph.

The question I receive most often is, “What if we do nothing?” Doing nothing really isn’t an option — the lake and the water treatment plant aren’t getting any younger, and the maintenance required to keep the plant operational is cost-prohibitive. For example, by 2027 the membranes in the existing plant, using outdated technology not best suited for our lake, will need to be replaced at an estimated cost of $10 million. Seeking new revenue bonds at this time, backed by the voters, will allow the city to take advantage of highly competitive financing rates, keeping the total project cost as low as possible and minimizing rate impacts to water users.

There is far more information about this project than what I can share in a short letter to the editor. I encourage you to visit the city’s water treatment plant website at www.maryville.org/WTP to find a wealth of information about the bond issue, water chemistry and treatment options, next steps, and project schedule and timing. I hope to see you at the polls on Tuesday to support our new water treatment plant!