Emergency repairs made to lift station

TONY BROWN/DAILY FORUM
Workmen install a new electrical panel Thursday at the city of Maryville’s sanitary sewer Southwest Lift Station. The panel had been causing pump problems at the facility for some time, and the replacement was placed on emergency footing by Public Works Director C.E. Goodall so that work could proceed immediately. The crew also installed a new, more powerful pump at the station, which mechanically forces sewage into gravity mains that ultimately carry the effluent to the city’s wastewater treatment plant.

A Maryville Public Works crew on Thursday worked to complete emergency replacement of a troublesome electrical panel at the Southwest Lift Station across Route V from Maryville Middle School.

Part of the city’s sanitary sewer collection system, the lift station mechanically forces sewage from a collection point into gravity mains that ultimately carry effluent to the city’s wastewater treatment plant east of town.

According to a report submitted to the City Council by Public Works Director C.E. Goodall, the old panel had been causing problems for some time, resulting in pump damage.

The current city budget contains $25,000 earmarked for electrical/control panel replacement at the station, a purchase that would normally require the city to seek competitive bids.

However, as quotes were being compiled from vendors, the panel failed again, which led Goodall to classify its replacement as an emergency.

Funds for emergency repairs to municipal infrastructure in cases where failure would significantly interrupt essential services can be spent without the formality of seeking bids.

In this case, Goodall, with the council’s approval, arranged for acquisition of the new panel from Allied Systems Inc. at a not-to-exceed cost of $11,598. In addition, the city paid an extra $450 to expedite repairs and move installation ahead to this week. The job was originally to have take place sometime during the week of March 30.

Work at the lift station also included installation of a rebuilt 70-horsepower pump, also purchased from Allied on an emergency basis.

The station had been running on two pumps, rated for 21.5 horsepower and 30 horsepower, which Goodall said was insufficient for operation during a heavy rain.

Not-to-exceed cost of the pump was $11,371.