Skip to content

Ravenwood seeks to shore up City Hall

TONY BROWN/DAILY FORUM
The building housing Ravenwood’s City Hall has stood for at least 100 years, but the structure’s future depends on the practicality and cost of repairing a badly degraded wall, the condition of which has worsened since the removal of a neighboring storefront.

In a time when a lot of people seem to be worried about the government falling apart, the small east Nodaway County town of Ravenwood is working hard to keep it all together — literally.

It’s not that Ravenwood is divided by any major issues. In fact the community, proud home of the Northeast Nodaway Bluejays, is unusually close knit even by northwest Missouri standards.

But at City Hall, located in the heart of Main Street, otherwise known as Highway 46, the rampart of local government is crumbling.

Well, it’s not really a rampart, just a wall. The south wall to be exact, which after a century of baking-hot summers and brutal prairie winters has had just about all it can take.

Like scores of old buildings across rural north Missouri, the storefront housing the Ravenwood City Hall was built out of “soft” brick and lime mortar never intended to stand up to more than 100 years of wear and tear.

Now things have gotten to the point where one more coat of stucco or some tuck pointing isn’t going to do the job. So the Board of Aldermen, which next meets on April 4, has put out a request-for-proposals to contractors who might be interested in providing a permanent fix.

The problem came to light early this year when the neighboring storefront, which was literally just a front — no roof, no side or rear walls, no floors — started to bow out toward the street.

The tin-and-brick facade was torn down, which stripped away whatever support it was lending to an adjoining City Hall wall that was already ailing from years of exposure to the elements.

At the last aldermen’s meeting, James Teaney, a former Ravenwood mayor who now serves as the town’s water plant operator and maintenance chief, said the time had come to waterproof and stabilize the wall before further degradation destabilizes the entire structure.

Another option would be to move City Hall to another location, but Teaney said Friday that in a town as small as Ravenwood the availability of suitable buildings is limited. Also, the community has already spent a fair amount of money upgrading other parts of the building and adding a workshop in back.

In addition to rehabbing the wall, Teaney recommended using metal straps to secure the building’s metal face before it pulls away from the weakening structure.

And while the town is at it, there is some insulation that needs to be replaced that was apparently damaged by a trespassing raccoon.

Whether all of this can be accomplished for the amount of money Ravenwood can afford remains to be seen.

“We’re limited by what we have to spend, but we want to save it if we can,” Teaney said.

Leave a Comment