Fourth Street celebration set for June 15

CITY OF MARYVILLE PHOTO
Pictured is a portion of the newly repaved and streetscaped West Fourth Street corridor at the reconfigured Dunn Street intersection just west of the main entrance to Northwest Missouri State University.
MARYVILLE, Mo. — The city of Maryville and Northwest Missouri State University will co-host a public celebration later this month marking completion of the newly streetscaped West Fourth Street corridor.
The free event, billed as a ribbon-cutting and block party, will take place from 6-8 p.m. Monday, June 15, in the vicinity of Fourth and Buchanan.
A complimentary hamburger or hot dog with chips and a drink will be served to the first 400 guests. Attractions are to include face painting, inflatables, fire and police vehicle displays, prizes and giveaways.
Completed this spring, the $2 million project was conceived as a way to physically and aesthetically link downtown Maryville to the Northwest campus.
In addition to municipal tax revenues, funding for the project came from the university, grants awarded by the Missouri Department of Transportation, and tax credits made available through the state Department of Economic Development.
Signature features of the streetscape include a gateway arch at the intersection of Fourth and Buchanan that contains logos symbolizing both the university and the city.
Other enhancements comprise vintage-style streetlights, a paved handicap-friendly trail, decorative masonry and brick pillars, landscaping, drinking water and drainage infrastructure and a reconfigured intersection at Fourth and Dunn streets.
Newly planted trees and shrubs along the corridor serve to extend the Missouri Arboretum, a state designation that applies to the Northwest campus.
